UK Banking Hub, Buckinghamshire
Full Refurbishment
Overview
Delivery of a full Cat A refurbishment to an existing high street premises, finishing with the supervision and coordination of the subsequent Cat B fit out works, all delivered as part of a national framework agreement.
Working on a busy high street location, our team was responsible for transforming the space from strip-out through to a fully furnished space ready for occupation.
-
Duration
8 Weeks
-
Project value
£190k
Scope of work
Our projects team meticulously managed all works from full strip out of the existing walls and services to the installation of new M&E systems, including a full electrical rewire and HVAC systems.
Despite an unexpected delay at the start of the refurbishment, all works were completed on schedule while ensuring full compliance with current Building Regulations and fire safety standards.
Key Activities
- Strip out and removal of redundant fixtures, fittings and services
- Full design and installation of all M&E services
- Installation of new partitions, glazing, flooring and suspended ceiling to create a compliant and functional internal layout
- Installation of new fixtures and fittings, bespoke joinery and final detailing to meet the required design guidance
- Full internal decoration including surface preparation, painting, and finishing works